BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Mast and Vertical Frame

Assembly

Tall rigid steel or composite tower structure that guides spindle vertical travel and supports rotating load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mast and Vertical Frame parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Mast and Vertical Frame parts diagram: 1 main vertical mast, 2 cross-bracing members, 3 spindle traveling carriage, 4 linear guide rails. 4 parts in 4 top-level items.
Mast and Vertical Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Vertical Mast 1× Central vertical column
2 Cross-Bracing Members 1× Cross-bracing and stability members
3 Spindle Traveling Carriage 1× Vertically traveling bearing block
4 Linear Guide Rails 1× Linear bearing surfaces for carriage

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mast and Vertical Frame

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Vertical Mast raise-borer-main-mast 1× 1 · part
2 Cross-Bracing Members raise-borer-side-braces 1× 1 · part
3 Spindle Traveling Carriage raise-borer-spindle-carriage 1× 1 · part
4 Linear Guide Rails raise-borer-guide-rails 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the mast and vertical frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks