BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Receiving Hopper & Inlet

Assembly

Large funnel-shaped bin at the belt intake that funnels rubble chunks onto the belt and prevents bridging. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Receiving Hopper & Inlet parts and their functions

6 top-level parts · 15 parts in total · full bill of materials below
Receiving Hopper & Inlet parts diagram: 1 hopper side panel, 2 hopper back panel, 3 hopper apron plate, 4 hopper gate valve, 5 hopper baffle, 6 fastener set. 15 parts in 6 top-level items.
Receiving Hopper & Inlet parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hopper Side Panel 2× Welded or bolted steel plate, 3–5 mm thick, sloped 45–50° from vertical for material flow.
2 Hopper Back Panel 1× Upper rear panel directing falling rubble toward the belt intake.
3 Hopper Apron Plate 1× Replaceable wear plate at the hopper throat, protecting the structure from impact.
4 Hopper Gate Valve 1× Manual or electric slide gate controlling rubble flow rate into the belt.
5 Hopper Baffle 2× Internal divider minimizing rubble bridging (arch over) during gravity flow.
6 Fastener Set 8× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Receiving Hopper & Inlet

6 top-level lines · 6 rows shown · 15 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hopper Side Panel rubble-conveyor-hopper-side-panel 2× 2 · part
2 Hopper Back Panel rubble-conveyor-hopper-back-panel 1× 1 · part
3 Hopper Apron Plate rubble-conveyor-hopper-front-apron 1× 1 · part
4 Hopper Gate Valve rubble-conveyor-hopper-gate-valve 1× 1 · part
5 Hopper Baffle rubble-conveyor-hopper-baffle 2× 2 · part
6 Fastener Set fastener-set 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the receiving hopper & inlet is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks