BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Articulated Demolition Arm

Assembly

Three-joint hydraulic arm (boom, stick, wrist) reaching 4–8 m, with precise control for selective interior demolition. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Articulated Demolition Arm parts and their functions

7 top-level parts · 12 parts in total · full bill of materials below
Articulated Demolition Arm parts diagram: 1 boom section, 2 stick section, 3 wrist joint, 4 boom lift cylinder, 5 stick curl cylinder, 6 wrist rotation cylinder, 7 arm joint seal. 12 parts in 7 top-level items.
Articulated Demolition Arm parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Boom Section 1× Hydraulic cylinder-driven primary arm, 2–3 m, raising and lowering.
2 Stick Section 1× Secondary arm, 1.5–2.5 m, pinned to boom, providing curl and reach.
3 Wrist Joint 1× Final articulation (pitch, roll, yaw) allowing tool orientation in three axes.
4 Boom Lift Cylinder 1× Duplex-rod piston cylinder raising/lowering boom with load sensing.
5 Stick Curl Cylinder 1× Single or duplex cylinder rotating stick arm about boom hinge.
6 Wrist Rotation Cylinder 1× Compact cylinder(s) articulating wrist for pitch and roll.
7 Arm Joint Seal 6× Elastomer or polyurethane seal preventing oil weepage at arm articulation pins.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Articulated Demolition Arm

7 top-level lines · 7 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Boom Section selective-demolition-robot-boom-section 1× 1 · part
2 Stick Section selective-demolition-robot-stick-section 1× 1 · part
3 Wrist Joint selective-demolition-robot-wrist-joint 1× 1 · part
4 Boom Lift Cylinder selective-demolition-robot-boom-cylinder 1× 1 · part
5 Stick Curl Cylinder selective-demolition-robot-stick-cylinder 1× 1 · part
6 Wrist Rotation Cylinder selective-demolition-robot-wrist-cylinder 1× 1 · part
7 Arm Joint Seal selective-demolition-robot-arm-joint-seal 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the articulated demolition arm is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks