Erection System

Assembly

Hydraulic cylinders and sequencing valves that unfold tower and jib in a fixed, interlocked order in 20–60 minutes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Erection System

6 top-level lines as of r151970
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Erection Cylinder self-erecting-tower-crane-erection-cylinder 2× 2 · part
2 Erection Power Pack self-erecting-tower-crane-erection-hpu 1× 1 · part
3 Sequencing Manifold self-erecting-tower-crane-sequence-valve 1× 1 · part
4 Erection Rope Kit self-erecting-tower-crane-erection-rope 1× 1 · part
5 Pressure Sensor pressure-sensor 2× 2 · part
6 Oil Seal oil-seal 4× 4 · part