Self-Erecting Tower Crane

Product

Overview

A self-erecting tower crane folds its entire structure, tower, jib and counter-ballast frame, onto a road-towable package, and unfolds it on site without an assist crane. Where a conventional top-slewing tower crane needs a mobile crane, a rigging crew and a day or more to assemble, a self-erector arrives behind a truck, plants its Ballast Base, and is lifting within the hour, run by a single operator walking the site with a Radio Remote. The type dominates low-rise residential construction in Europe: hook heights of 20–40 m, jibs of 25–50 m, around a tonne at the tip and 4–8 t close in, enough to fly roof trusses, masonry packs, formwork and concrete skips over a house or small apartment block.

Architecturally it is a bottom-slewing crane: the Slew Ring sits at the base and the whole tower rotates, with ballast on the slewing platform. This is what makes folding geometrically possible, and it concentrates all drives and the Electrical Cabinet near the ground for service.

Erection sequence

On site, the crane is jacked off its Axle Set onto the cruciform Base Chassis, levelled with the Levelling Jack corners to within about a tenth of a degree, lean at the base multiplies into metres of hook drift at full radius, and loaded with Ballast Block slabs totalling 20–40 t. Erection is then a fixed, interlocked hydraulic program. The Erection Cylinder pair rotates the folded tower about its Tower Hinge from horizontal to vertical; on many designs the Upper Tower Section section then telescopes or unfolds to final height, and tower motion simultaneously pulls the jib open through the Erection Rope Kit kit, root section first, tip section last. The Sequencing Manifold manifold enforces the order mechanically, the jib physically cannot deploy before every Tower Lock Pin pin has seated, and the Erection Power Pack that powers it all sits idle once the crane is working. Folding for transport is the same program reversed, which is the type's second economic advantage: the crane leaves the site as cheaply as it arrived.

Lifting machinery

The crane has exactly three working motions. The Hoist Winch raises the load on a rotation-resistant Hoist Rope reeved over the tower head to the Hook Block; reeving two-fall gives speed for light loads, four-fall doubles capacity at half speed. The Trolley Winch pulls the Load Trolley along the jib to set the working radius. And the Slew Gearmotor rotates the tower at about 0.8 rpm, its Slew Frequency Drive ramping acceleration gently because every degree per second squared of slew acceleration becomes load swing at the hook. All three drives are electric off a 32–63 A site supply, frequency-controlled for stepless speed, with the fail-safe Hoist Brake spring-applied whenever the drive is not actively holding torque. Many models work with the Jib Tip Section luffed up 15–30°, trading some radius for extra height under the hook, the standard trick for placing trusses over an already-built ridge.

Safety systems

Capacity is a curve, not a number: the Jib Tie Bar suspension and tower can carry 4–8 t near the mast but only about a tonne at full radius, and the Load-Moment Limiter enforces that chart continuously, reading rope tension from the Load Cell Pin pin and trolley position from its encoder. It cuts hoist-up and trolley-out, the two motions that increase load moment, before the chart is exceeded, leaving the operator free to bring the load inward. The Zone Limiter adds programmable slew and trolley exclusion zones over roads, rail lines and neighbouring plots, a regulatory requirement in dense European sites. The Anemometer alarms around 50 km/h; out of service the slew brake is released so the crane weathervanes, jib downwind, rather than presenting its full side area to a storm. Design, stability and wind cases follow EN 14439 and FEM crane classifications.

Operation and economics

The walking operator is the type's defining workflow. With the Remote Console on a belt and a Remote Joystick under each thumb, the same person slings the load, flies it and lands it, standing wherever sight lines are best; the Radio Receiver stops everything and sets brakes if the link drops. One machine and one person thus replace a crane operator, a banksman and often a telehandler. The crane's niche has hard edges, above roughly 40 m of hook height or 8 t of capacity, top-slewing cranes win, but inside that envelope the self-erector's near-zero assembly cost makes it the cheapest hook on sites measured in weeks or months, and rental fleets across Europe turn the same machine over dozens of sites in its life.

Bill of materials for Self-Erecting Tower Crane

8 top-level lines as of r151946
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Ballast Base 6 parts self-erecting-tower-crane-base 1× 1 0 assembly
2 Slewing Assembly 5 parts self-erecting-tower-crane-slewing 1× 1 0 assembly
3 Folding Tower 5 parts self-erecting-tower-crane-tower 1× 1 0 assembly
4 Folding Jib 6 parts self-erecting-tower-crane-jib 1× 1 0 assembly
5 Erection System 6 parts self-erecting-tower-crane-erection-system 1× 1 0 assembly
6 Hoist and Trolley Winches 6 parts self-erecting-tower-crane-hoist 1× 1 0 assembly
7 Electrics and Safety Systems 7 parts self-erecting-tower-crane-electrics 1× 1 0 assembly
8 Radio Remote 5 parts self-erecting-tower-crane-remote 1× 1 0 assembly