BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Telescoping Tractor Frame

Assembly

Welded box-section frame that telescopes sideways to match paving widths and carries the mold between the track legs. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Telescoping Tractor Frame parts and their functions

5 top-level parts · 13 parts in total · full bill of materials below
Telescoping Tractor Frame parts diagram: 1 telescoping main beam, 2 bolster beam, 3 swing leg, 4 hydraulic lift column, 5 fastener set. 13 parts in 5 top-level items.
Telescoping Tractor Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Telescoping Main Beam 2× Telescoping transverse box beams
2 Bolster Beam 2× Longitudinal bolster beams
3 Swing Leg 4× Pivoting track support legs
4 Hydraulic Lift Column 4× Hydraulic vertical lift posts
5 Fastener Set 1× Width-lock pin and bolt sets

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Telescoping Tractor Frame

5 top-level lines · 5 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Telescoping Main Beam slipform-paver-main-beam 2× 2 · part
2 Bolster Beam slipform-paver-bolster 2× 2 · part
3 Swing Leg slipform-paver-swing-leg 4× 4 · part
4 Hydraulic Lift Column slipform-paver-lift-column 4× 4 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the telescoping tractor frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks