BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Cabin and Instrumentation

Assembly

Operator cabin with controls, displays, and sensors for TBM navigation, safety monitoring, and automatic face pressure regulation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Cabin and Instrumentation parts and their functions

5 top-level parts · 12 parts in total · full bill of materials below
Control Cabin and Instrumentation parts diagram: 1 control panel, 2 total station theodolite, 3 pressure sensor, 4 LCD panel, 5 hall sensor. 12 parts in 5 top-level items.
Control Cabin and Instrumentation parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Control Panel 1× Main electrical control and HMI
2 Total Station Theodolite 1× Laser theodolite for alignment
3 Pressure Sensor 6× Face pressure, slurry, and hydraulic
4 LCD Panel 2× Operator displays
5 Hall Sensor 2× Load cell signal conditioning

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Cabin and Instrumentation

5 top-level lines · 5 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Control Panel slurry-tbm-control-panel 1× 1 · part
2 Total Station Theodolite slurry-tbm-total-station 1× 1 · part
3 Pressure Sensor pressure-sensor 6× 6 · part
4 LCD Panel lcd-panel 2× 2 · part
5 Hall Sensor hall-sensor 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the control cabin and instrumentation is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks