BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Mixing Tool

Assembly

The multi-shaft auger and paddle tool that cuts, lifts and blends the soil with injected binder into a column or panel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mixing Tool parts and their functions

6 top-level parts · 49 parts in total · full bill of materials below
Mixing Tool parts diagram: 1 mixing shaft, 2 auger flight, 3 mixing paddle, 4 cutting tooth, 5 injection nozzle, 6 binder swivel. 49 parts in 6 top-level items.
Mixing Tool parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mixing Shaft 3× Mixing shafts
2 Auger Flight 3× Auger flights
3 Mixing Paddle 12× Mixing paddles
4 Cutting Tooth 24× Cutting teeth
5 Injection Nozzle 6× Binder nozzles
6 Binder Swivel 1× Binder swivel

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mixing Tool

6 top-level lines · 6 rows shown · 49 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mixing Shaft soil-mixing-rig-mixing-shaft 3× 3 · part
2 Auger Flight soil-mixing-rig-auger-flight 3× 3 · part
3 Mixing Paddle soil-mixing-rig-mixing-paddle 12× 12 · part
4 Cutting Tooth soil-mixing-rig-cutting-tooth 24× 24 · part
5 Injection Nozzle soil-mixing-rig-injection-nozzle 6× 6 · part
6 Binder Swivel soil-mixing-rig-swivel 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the mixing tool is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks