BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Work Platform Basket

Assembly

Enclosed personnel platform rated for 2–6 workers with fall protection and entry gate. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Work Platform Basket parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Work Platform Basket parts diagram: 1 basket frame, 2 basket floor, 3 basket guardrail, 4 basket gate, 5 basket attachment. 7 parts in 5 top-level items.
Work Platform Basket parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Basket Frame 1× Welded steel or aluminum platform frame
2 Basket Floor 1× Anti-slip decking material
3 Basket Guardrail 3× Perimeter safety rails (1.1 m high minimum)
4 Basket Gate 1× Hinged safety gate for entry/exit
5 Basket Attachment 1× Quick-disconnect coupling to boom tip

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Work Platform Basket

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Basket Frame spider-lift-basket-frame 1× 1 · part
2 Basket Floor spider-lift-basket-floor 1× 1 · part
3 Basket Guardrail spider-lift-basket-guardrails 3× 3 · part
4 Basket Gate spider-lift-basket-gate 1× 1 · part
5 Basket Attachment spider-lift-basket-attachment 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the work platform basket is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks