BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Work Platform

Assembly

Steel platform with railings, toe boards, and attachment points for hoists and safety equipment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Work Platform parts and their functions

6 top-level parts · 73 parts in total · full bill of materials below
Work Platform parts diagram: 1 platform frame, 2 platform deck, 3 safety rail, 4 toe board, 5 hoist attachment eye, 6 fastener set. 73 parts in 6 top-level items.
Work Platform parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Platform Frame 1× Welded steel frame, 3–6 m × 1–1.5 m
2 Platform Deck 1× Wooden planks or aluminum decking
3 Safety Rail 2× Top and mid-rail, 1.2 m high
4 Toe Board 1× Toe board preventing tools from rolling off
5 Hoist Attachment Eye 4× Eye-lugs for rope and hoist coupling
6 Fastener Set 64× Platform deck and railing fasteners

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Work Platform

6 top-level lines · 6 rows shown · 73 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Platform Frame suspended-scaffold-platform-frame 1× 1 · part
2 Platform Deck suspended-scaffold-platform-deck 1× 1 · part
3 Safety Rail suspended-scaffold-safety-railing 2× 2 · part
4 Toe Board suspended-scaffold-toe-board 1× 1 · part
5 Hoist Attachment Eye suspended-scaffold-hoist-attachment 4× 4 · part
6 Fastener Set fastener-set 64× 64 · part

Something wrong in this list? Report a problem with this BOM.

Where the work platform is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks