Main Suspension Rope
AssemblyMultiple independent wire ropes anchoring the platform to the roof, with redundancy for safety. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Main Suspension Rope parts and their functions
5 top-level parts · 29 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Suspension Rope | 4× | 16–20 mm diameter wire rope, 8×19 or 6×19 construction |
| 2 | Rope Terminator | 8× | Rope termination ferrules and eye-splices |
| 3 | Cable Clamp | 12× | Cable clamps (Crosby type) for mechanical rope splicing |
| 4 | Anchor Shackle | 4× | Anchor shackles coupling ropes to roof rigging |
| 5 | Wire Bundle | 1× | Additional backup ropes, 12 mm diameter |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Main Suspension Rope
5 top-level lines · 5 rows shown · 29 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Suspension Rope | suspended-scaffold-primary-rope | 4× | 4 | · | part |
| 2 | Rope Terminator | suspended-scaffold-rope-terminator | 8× | 8 | · | part |
| 3 | Cable Clamp | suspended-scaffold-rope-clamp | 12× | 12 | · | part |
| 4 | Anchor Shackle | suspended-scaffold-shackle | 4× | 4 | · | part |
| 5 | Wire Bundle | wire-bundle | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the main suspension rope is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$20. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| gabrielindia.com ↗ | Pune, IN | Shock absorbers & dampers | 2,000 pcs | 5–8 wks |
| jaiparabolic.com ↗ | Yamunanagar, IN | Leaf & parabolic springs | 2,000 pcs | 5–8 wks |
| munjalshowa.net ↗ | Gurugram, IN | Shock absorbers & struts | 2,000 pcs | 5–8 wks |
| sokonindustry.com ↗ | Chongqing, CN | Springs & auto parts | 2,000 pcs | 5–8 wks |
| nrbbearings.com ↗ | Mumbai, IN | Needle & auto bearings | 2,000 pcs | 5–8 wks |