BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Track Group

Assembly

Chain, shoes, and rollers of one side. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Track Group parts and their functions

4 top-level parts · 304 parts in total · full bill of materials below
Track Group parts diagram: 1 track chain, 2 track shoe (triple grouser), 3 track roller, 4 carrier roller. 304 parts in 4 top-level items.
Track Group parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Track Chain 4 parts 1× Articulated chain of links, pins, and bushings.
2 Track Shoe (Triple Grouser) 49× Triple-grouser shoes bolted to the chain
3 Track Roller 8× Lower rollers carrying machine weight
4 Carrier Roller 2× Upper rollers supporting the chain

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Track Group

4 top-level lines · 8 rows shown · 304 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Track Chain 4 parts track-excavator-track-chain 1× 1 245 assembly
1.1 Track Link track-excavator-track-link 98× 98 · part
1.2 Track Pin track-excavator-track-pin 49× 49 · part
1.3 Track Bushing track-excavator-track-bushing 49× 49 · part
1.4 Oil Seal oil-seal 49× 49 · part
2 Track Shoe (Triple Grouser) track-excavator-track-shoe 49× 49 · part
3 Track Roller track-excavator-track-roller 8× 8 · part
4 Carrier Roller track-excavator-carrier-roller 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the track group is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks