BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Ballast & Load Distribution

Assembly

Fixed counterweight and variable ballast blocks maintaining stability as boom angle and wrecking-ball height change. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Ballast & Load Distribution parts and their functions

5 top-level parts · 17 parts in total · full bill of materials below
Ballast & Load Distribution parts diagram: 1 counterweight block, 2 counterweight bracket, 3 ballast frame, 4 sliding ballast weight, 5 fastener set. 17 parts in 5 top-level items.
Ballast & Load Distribution parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Counterweight Block 4× Cast iron or steel ingot, 2–5 tonnes each, bolted to crane base rear.
2 Counterweight Bracket 2× Welded steel frame bolting blocks to the crane superstructure.
3 Ballast Frame 1× Adjustable or sliding frame on the crane base, allowing ballast repositioning per load chart.
4 Sliding Ballast Weight 2× Heavy block movable along a rail, adjusting crane moment center as boom angle changes.
5 Fastener Set 8× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Ballast & Load Distribution

5 top-level lines · 5 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Counterweight Block wrecking-ball-crane-counterweight-block 4× 4 · part
2 Counterweight Bracket wrecking-ball-crane-counterweight-bracket 2× 2 · part
3 Ballast Frame wrecking-ball-crane-ballast-frame 1× 1 · part
4 Sliding Ballast Weight wrecking-ball-crane-sliding-weight 2× 2 · part
5 Fastener Set fastener-set 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the ballast & load distribution is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks