Suspension Cable & Rigging

Assembly

Heavy wire rope and hardware connecting the hoist drum through boom sheaves to the wrecking ball. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Suspension Cable & Rigging parts and their functions

6 top-level parts · 12 parts in total · full bill of materials below
Suspension Cable & Rigging parts diagram: 1 main wire rope, 2 cable thimble, 3 cable socket, 4 connecting shackle, 5 cable lug, 6 rope splice kit. 12 parts in 6 top-level items.
Suspension Cable & Rigging parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Wire Rope 1× 32–40 mm 6x36 or 8x36 wire rope, rated SWL (Safe Working Load) 50–100 tonnes.
2 Cable Thimble 4× Formed steel eye protector inserted into rope loop to prevent strand crush.
3 Cable Socket 2× Forged wedge socket terminating wire rope, allowing safe crimped attachment to shackles.
4 Connecting Shackle 2× Forged steel pin shackle coupling cable eyes to boom sheave or ball eye lug.
5 Cable Lug 2× Mechanical or swaged termination fitting at rope ends, rated for full cable breaking strength.
6 Rope Splice Kit 1× Wire rope splicing tools and documentation for field repairs during downtime.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Suspension Cable & Rigging

6 top-level lines · 6 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Wire Rope wrecking-ball-crane-cable-main 1× 1 · part
2 Cable Thimble wrecking-ball-crane-cable-thimble 4× 4 · part
3 Cable Socket wrecking-ball-crane-cable-socket 2× 2 · part
4 Connecting Shackle wrecking-ball-crane-cable-shackle 2× 2 · part
5 Cable Lug wrecking-ball-crane-cable-lugs 2× 2 · part
6 Rope Splice Kit wrecking-ball-crane-cable-splice-kit 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the suspension cable & rigging is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Motherson
motherson.com ↗
Noida, IN Wiring harness & modules 1,000 sets 4–6 wks
🇮🇳Polycab
polycab.com ↗
Mumbai, IN Wires & cables 1,000 sets 4–6 wks
🇨🇳Luxshare
luxshare-ict.com ↗
Dongguan, CN Connectors & cables 1,000 sets 4–6 wks
🇨🇳Hengtong
hengtonggroup.com ↗
Suzhou, CN Cables 1,000 sets 4–6 wks
🇮🇳Finolex
finolex.com ↗
Pune, IN Wires & cables 1,000 sets 4–6 wks