BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Primary Collecting Conveyor

Assembly

Short conveyor under the drum that gathers milled asphalt and hands it to the discharge conveyor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Primary Collecting Conveyor parts and their functions

5 top-level parts · 16 parts in total · full bill of materials below
Primary Collecting Conveyor parts diagram: 1 conveyor belt, 2 belt idler, 3 conveyor roller, 4 conveyor drive, 5 belt scraper. 16 parts in 5 top-level items.
Primary Collecting Conveyor parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Conveyor Belt 1× Conveyor belt
2 Belt Idler 8× Belt idlers
3 Conveyor Roller 2× Head and tail rollers
4 Conveyor Drive 3 parts 1× Conveyor drive
5 Belt Scraper 1× Belt scraper

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Primary Collecting Conveyor

5 top-level lines · 8 rows shown · 16 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Conveyor Belt asphalt-milling-machine-conveyor-belt 1× 1 · part
2 Belt Idler asphalt-milling-machine-conveyor-idler 8× 8 · part
3 Conveyor Roller asphalt-milling-machine-conveyor-roller 2× 2 · part
4 Conveyor Drive 3 parts asphalt-milling-machine-conveyor-motor 1× 1 4 assembly
4.1 Hydraulic Motor asphalt-milling-machine-hydraulic-motor 1× 1 · part
4.2 Helical Gear Pair gear-pair 1× 1 · part
4.3 Ball Bearing ball-bearing 2× 2 · part
5 Belt Scraper asphalt-milling-machine-conveyor-scraper 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the primary collecting conveyor is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks