Inclined Reclaimer Screw
AssemblyArchimedes dewatering auger climbing at 18 degrees, lifting coarse aggregate and sand clear of the slurry while water drains back. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Inclined Reclaimer Screw
8 top-level lines as of r35481| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Screw Trough | concrete-recycling-plant-screw-trough | 1× | 1 | · | part |
| 2 | Auger Flight | concrete-recycling-plant-auger-flight | 1× | 1 | · | part |
| 3 | Auger Shaft | concrete-recycling-plant-auger-shaft | 1× | 1 | · | part |
| 4 | Flight Wear Shoe | concrete-recycling-plant-screw-liner | 6× | 6 | · | part |
| 5 | Trough Overflow Weir | concrete-recycling-plant-trough-weir | 1× | 1 | · | part |
| 6 | Submerged Tail Bearing | concrete-recycling-plant-tail-bearing | 1× | 1 | · | part |
| 7 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 8 | Oil Seal | oil-seal | 2× | 2 | · | part |