BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Operator Control Station

Assembly

Seated operator console with hydraulic levers, instrument display and electrical system. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Control Station parts and their functions

4 top-level parts · 49 parts in total · full bill of materials below
Operator Control Station parts diagram: 1 control console, 2 parameter display, 3 rig controller, 4 electrical system. 49 parts in 4 top-level items.
Operator Control Station parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Control Console 2 parts 1× Lever and gauge console
2 Parameter Display 2 parts 1× Drilling parameter display
3 Rig Controller 5 parts 1× Rig control PCB
4 Electrical System 4 parts 1× Electrical distribution

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Control Station

4 top-level lines · 20 rows shown · 49 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Control Console 2 parts drilling-rig-truck-console 1× 1 · part
1.1 Sheet Metal Panel sheet-panel 2× 2 · part
1.2 Pressure Sensor pressure-sensor 3× 3 · part
2 Parameter Display 2 parts drilling-rig-truck-display 1× 1 · part
2.1 LCD Panel lcd-panel 1× 1 · part
2.2 Connector connector 1× 1 · part
3 Rig Controller 5 parts drilling-rig-truck-controller 1× 1 10 assembly
3.1 Bare PCB pcb-bare 1× 1 · part
3.2 Microcontroller mcu 1× 1 · part
3.3 SMD Passive (R/C/L) smd-passives 1× 1 · part
3.4 Relay relay 4× 4 · part
3.5 Connector connector 3× 3 · part
4 Electrical System 4 parts drilling-rig-truck-electrical 1× 1 32 assembly
4.1 Alternator 3 parts drilling-rig-truck-alternator 1× 1 24 assembly
4.1.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
4.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
4.1.3 Ball Bearing ball-bearing 2× 2 · part
4.2 Power Supply power-supply 1× 1 · part
4.3 Wire Bundle wire-bundle 1× 1 · part
4.4 Connector connector 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the operator control station is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks