Horizontal Load Jib
AssemblyHorizontal lattice working arm carrying the trolley track, with in-plane tie bars instead of overhead pendants. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Horizontal Load Jib parts and their functions
4 top-level parts · 70 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Jib Section 3 parts | 6× | Bolted jib lattice unit |
| 2 | Jib Tie Bar | 4× | In-plane jib tie |
| 3 | Jib Tip Section 3 parts | 1× | Outer jib end |
| 4 | Trolley Running Track | 1× | Trolley running rail |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Horizontal Load Jib
4 top-level lines · 10 rows shown · 70 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Jib Section 3 parts | flat-top-tower-crane-jib-section | 6× | 6 | 10 | assembly |
| 1.1 | Jib Main Chord | flat-top-tower-crane-jib-chord | 3× | 18 | · | part |
| 1.2 | Jib Lacing Set | flat-top-tower-crane-jib-lacing | 1× | 6 | · | part |
| 1.3 | Jib End Connector | flat-top-tower-crane-jib-connector | 6× | 36 | · | part |
| 2 | Jib Tie Bar | flat-top-tower-crane-jib-tie-bar | 4× | 4 | · | part |
| 3 | Jib Tip Section 3 parts | flat-top-tower-crane-jib-tip | 1× | 1 | 5 | assembly |
| 3.1 | Jib Tip Sheave | flat-top-tower-crane-tip-sheave | 2× | 2 | · | part |
| 3.2 | Jib End Stop | flat-top-tower-crane-jib-end-stop | 1× | 1 | · | part |
| 3.3 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 4 | Trolley Running Track | flat-top-tower-crane-trolley-track | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the horizontal load jib is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |