BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Horizontal Load Jib

Assembly

Horizontal lattice working arm carrying the trolley track, with in-plane tie bars instead of overhead pendants. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Horizontal Load Jib parts and their functions

4 top-level parts · 70 parts in total · full bill of materials below
Horizontal Load Jib parts diagram: 1 jib section, 2 jib tie bar, 3 jib tip section, 4 trolley running track. 70 parts in 4 top-level items.
Horizontal Load Jib parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Jib Section 3 parts 6× Bolted jib lattice unit
2 Jib Tie Bar 4× In-plane jib tie
3 Jib Tip Section 3 parts 1× Outer jib end
4 Trolley Running Track 1× Trolley running rail

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Horizontal Load Jib

4 top-level lines · 10 rows shown · 70 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Jib Section 3 parts flat-top-tower-crane-jib-section 6× 6 10 assembly
1.1 Jib Main Chord flat-top-tower-crane-jib-chord 3× 18 · part
1.2 Jib Lacing Set flat-top-tower-crane-jib-lacing 1× 6 · part
1.3 Jib End Connector flat-top-tower-crane-jib-connector 6× 36 · part
2 Jib Tie Bar flat-top-tower-crane-jib-tie-bar 4× 4 · part
3 Jib Tip Section 3 parts flat-top-tower-crane-jib-tip 1× 1 5 assembly
3.1 Jib Tip Sheave flat-top-tower-crane-tip-sheave 2× 2 · part
3.2 Jib End Stop flat-top-tower-crane-jib-end-stop 1× 1 · part
3.3 Ball Bearing ball-bearing 2× 2 · part
4 Trolley Running Track flat-top-tower-crane-trolley-track 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the horizontal load jib is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks