Trailer Chassis
AssemblyRoad-towable frame carrying the plant; jacks down to a level base on site. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Trailer Chassis parts and their functions
6 top-level parts · 46 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Frame | 1× | Welded I-beam ladder frame. |
| 2 | Drawbar & Coupling 3 parts | 1× | |
| 3 | Road Axle 5 parts | 2× | |
| 4 | Leveling Jack 3 parts | 4× | |
| 5 | Outrigger Leg | 4× | Pin-out stabilizer arm. |
| 6 | Fastener Set | 4× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Trailer Chassis
6 top-level lines · 17 rows shown · 46 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Frame | mobile-concrete-plant-main-frame | 1× | 1 | · | part |
| 2 | Drawbar & Coupling 3 parts | mobile-concrete-plant-drawbar | 1× | 1 | 3 | assembly |
| 2.1 | Drawbar Beam | mobile-concrete-plant-drawbar-beam | 1× | 1 | · | part |
| 2.2 | Pintle Towing Eye | mobile-concrete-plant-pintle-eye | 1× | 1 | · | part |
| 2.3 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 3 | Road Axle 5 parts | mobile-concrete-plant-road-axle | 2× | 2 | 11 | assembly |
| 3.1 | Axle Beam | mobile-concrete-plant-axle-beam | 1× | 2 | · | part |
| 3.2 | Road Wheel & Tire | mobile-concrete-plant-road-wheel | 2× | 4 | · | part |
| 3.3 | Leaf Spring | mobile-concrete-plant-leaf-spring | 2× | 4 | · | part |
| 3.4 | Ball Bearing | ball-bearing | 4× | 8 | · | part |
| 3.5 | Oil Seal | oil-seal | 2× | 4 | · | part |
| 4 | Leveling Jack 3 parts | mobile-concrete-plant-leveling-jack | 4× | 4 | 3 | assembly |
| 4.1 | Jack Screw | mobile-concrete-plant-jack-screw | 1× | 4 | · | part |
| 4.2 | Jack Foot Pad | mobile-concrete-plant-jack-foot | 1× | 4 | · | part |
| 4.3 | Jack Outer Tube | mobile-concrete-plant-jack-tube | 1× | 4 | · | part |
| 5 | Outrigger Leg | mobile-concrete-plant-outrigger | 4× | 4 | · | part |
| 6 | Fastener Set | fastener-set | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the trailer chassis is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |