Crushing Unit
AssemblySingle-toggle jaw crusher reducing feed rock to a set product size. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Crushing Unit parts and their functions
8 top-level parts · 14 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Jaw Crusher Frame | 1× | Crusher main frame |
| 2 | Swing Jaw 2 parts | 1× | Moving jaw assembly |
| 3 | Fixed Jaw Die | 1× | Fixed jaw die |
| 4 | Eccentric Shaft | 1× | Drive eccentric shaft |
| 5 | Toggle Plate | 1× | Overload-protection toggle |
| 6 | Flywheel | 2× | Energy-storage flywheels |
| 7 | CSS Adjuster 2 parts | 1× | Closed-side-setting adjuster |
| 8 | Ball Bearing | 4× | Eccentric shaft bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Crushing Unit
8 top-level lines · 12 rows shown · 14 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Jaw Crusher Frame | mobile-crusher-jaw-frame | 1× | 1 | · | part |
| 2 | Swing Jaw 2 parts | mobile-crusher-swing-jaw | 1× | 1 | 2 | assembly |
| 2.1 | Swing Jaw Die | mobile-crusher-swing-jaw-die | 1× | 1 | · | part |
| 2.2 | Pitman | mobile-crusher-jaw-stock | 1× | 1 | · | part |
| 3 | Fixed Jaw Die | mobile-crusher-fixed-jaw-plate | 1× | 1 | · | part |
| 4 | Eccentric Shaft | mobile-crusher-eccentric-shaft | 1× | 1 | · | part |
| 5 | Toggle Plate | mobile-crusher-toggle-plate | 1× | 1 | · | part |
| 6 | Flywheel | mobile-crusher-flywheel | 2× | 2 | · | part |
| 7 | CSS Adjuster 2 parts | mobile-crusher-css-adjuster | 1× | 1 | 2 | assembly |
| 7.1 | CSS Cylinder | mobile-crusher-css-cylinder | 1× | 1 | · | part |
| 7.2 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 8 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
Where the crushing unit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |