BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Boom Point Section

Assembly

Boom tip carrying the main load sheaves and pendant connections. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Boom Point Section parts and their functions

4 top-level parts · 29 parts in total · full bill of materials below
Boom Point Section parts diagram: 1 boom point frame, 2 load sheave, 3 ball bearing, 4 sheave pin. 29 parts in 4 top-level items.
Boom Point Section parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Boom Point Frame 1× Point lattice frame
2 Load Sheave 7× Load line sheaves
3 Ball Bearing 14× Deep-groove radial ball bearing.
4 Sheave Pin 7× Hardened pin retaining a load sheave in its frame.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Boom Point Section

4 top-level lines · 4 rows shown · 29 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Boom Point Frame ringer-crane-boom-top-frame 1× 1 · part
2 Load Sheave ringer-crane-load-sheave 7× 7 · part
3 Ball Bearing ball-bearing 14× 14 · part
4 Sheave Pin ringer-crane-sheave-pin 7× 7 · part

Something wrong in this list? Report a problem with this BOM.

Where the boom point section is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks