BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Air Supply

Assembly

Compressed air used at the nozzle to atomise and accelerate the concrete and to drive the spray; large machines carry an on-board compressor, others take site air. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Air Supply parts and their functions

4 top-level parts · 8 parts in total · full bill of materials below
Air Supply parts diagram: 1 air compressor, 2 air receiver, 3 air regulator, 4 air hose. 8 parts in 4 top-level items.
Air Supply parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air Compressor 4 parts 1× Air compressor
2 Air Receiver 1× Air receiver
3 Air Regulator 1× Air regulator
4 Air Hose 1× Air hose

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Air Supply

4 top-level lines · 8 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air Compressor 4 parts shotcrete-pump-air-compressor 1× 1 5 assembly
1.1 Compressor Block shotcrete-pump-compressor-block 1× 1 · part
1.2 Motor Cooling Fan shotcrete-pump-cooling-fan 1× 1 · part
1.3 Ball Bearing ball-bearing 2× 2 · part
1.4 Oil Seal oil-seal 1× 1 · part
2 Air Receiver shotcrete-pump-air-receiver 1× 1 · part
3 Air Regulator shotcrete-pump-air-regulator 1× 1 · part
4 Air Hose shotcrete-pump-air-hose 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the air supply is used

2 products across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks