BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r194045 of this page, not the current version. Go to current · history

Backup System and Tunnel Services

Assembly

A train of steel decks towed behind the machine that carries its power, hydraulics, conveyors and services, and supplies the tunnel behind it with fresh air, water, compressed air, drainage and material handling, plus a refuge chamber for the crew. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Backup System and Tunnel Services

13 top-level lines as of r194045
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Backup Bridge main-beam-tbm-backup-bridge 1× 1 · part
2 Backup Deck main-beam-tbm-backup-deck 8× 8 · part
3 Backup Wheel Set main-beam-tbm-backup-wheel-set 16× 16 · part
4 Material Handling Crane main-beam-tbm-material-crane 1× 1 · part
5 Electric Chain Hoist 9 parts chain-hoist 4× 4 0 product
6 Ventilation Duct Cassette main-beam-tbm-duct-cassette 1× 1 · part
7 Tunnel Ventilation Fan 7 parts tunnel-ventilation-fan 1× 1 0 product
8 Dust Scrubber 4 parts main-beam-tbm-dust-scrubber 1× 1 0 assembly
9 Water Supply and Cooling 4 parts main-beam-tbm-water-system 1× 1 0 assembly
10 Dewatering Pump main-beam-tbm-dewatering-pump 2× 2 · part
11 Rotary Screw Air Compressor 9 parts screw-compressor 1× 1 0 product
12 Refuge Chamber main-beam-tbm-refuge-chamber 1× 1 · part
13 Workshop and Spares Store main-beam-tbm-workshop 1× 1 · part