BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Forming Sleeves Assembly

Assembly

Ring mandrels and forming cups that spin and stretch dough portions into bagel shape. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Forming Sleeves Assembly parts and their functions

4 top-level parts · 13 parts in total · full bill of materials below
Forming Sleeves Assembly parts diagram: 1 ring mandrel, 2 forming cup, 3 sleeve motor, 4 sleeve bearing. 13 parts in 4 top-level items.
Forming Sleeves Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Ring Mandrel 4× Stainless-steel center pins (15–25 mm diameter) creating hole
2 Forming Cup 4× Rotating cup or sleeve around each mandrel
3 Sleeve Motor 1× Gearmotor spinning all four forming sleeves at 80–200 rpm
4 Sleeve Bearing 4× Roller bearings supporting each forming cup

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Forming Sleeves Assembly

4 top-level lines · 4 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Ring Mandrel bagel-forming-machine-ring-mandrel 4× 4 · part
2 Forming Cup bagel-forming-machine-forming-cup 4× 4 · part
3 Sleeve Motor bagel-forming-machine-sleeve-motor 1× 1 · part
4 Sleeve Bearing bagel-forming-machine-sleeve-bearing 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the forming sleeves assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks