Dasher & Scraper Assembly
AssemblyRotating shaft with fixed scrapers and rotating dasher blades that prevent ice crystal growth. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Dasher & Scraper Assembly parts and their functions
4 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Stainless Shaft | 1× | 316L stainless steel shaft with keyway, 30–40 mm diameter. |
| 2 | Stationary Scraper Blade | 2× | Fixed PTFE or rubber blade that clears frozen mixture from drum wall. |
| 3 | Rotating Dasher Blade 2 parts | 1× | Rubber or spring-steel dasher arm that beats the mixture. |
| 4 | Dasher Hub | 1× | Cast iron hub keyed to shaft. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Dasher & Scraper Assembly
4 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Stainless Shaft | batch-freezer-shaft | 1× | 1 | · | part |
| 2 | Stationary Scraper Blade | batch-freezer-stationary-scraper | 2× | 2 | · | part |
| 3 | Rotating Dasher Blade 2 parts | batch-freezer-rotating-dasher | 1× | 1 | 2 | assembly |
| 3.1 | Dasher Blade Element | batch-freezer-dasher-blade | 1× | 1 | · | part |
| 3.2 | Blade Mounting Block | batch-freezer-blade-mount | 1× | 1 | · | part |
| 4 | Dasher Hub | batch-freezer-hub | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the dasher & scraper assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |