BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hot Water Tank

Assembly

Insulated stainless reservoir holding 200–500 L of circulating pasteurization water. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hot Water Tank parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Hot Water Tank parts diagram: 1 tank body, 2 tank heater, 3 agitator paddle, 4 level gauge, 5 tank drain, 6 tank overflow. 6 parts in 6 top-level items.
Hot Water Tank parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Tank Body 1× Insulated stainless vessel
2 Tank Heater 1× Steam jacket or electric heating
3 Agitator Paddle 1× Paddle mixer preventing temperature layering
4 Level Gauge 1× Sight glass
5 Tank Drain 1× Low-point ball valve
6 Tank Overflow 1× Return to tank from drainage sump

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hot Water Tank

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tank Body bottle-pasteurizer-tunnel-tank-body 1× 1 · part
2 Tank Heater bottle-pasteurizer-tunnel-tank-heater 1× 1 · part
3 Agitator Paddle bottle-pasteurizer-tunnel-tank-agitator 1× 1 · part
4 Level Gauge bottle-pasteurizer-tunnel-tank-level-gauge 1× 1 · part
5 Tank Drain bottle-pasteurizer-tunnel-tank-drain 1× 1 · part
6 Tank Overflow bottle-pasteurizer-tunnel-tank-overflow 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the hot water tank is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks