BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Rinse-Water Pump and Heater

Assembly

Centrifugal pump supplying rinse manifold at controlled pressure and temperature, with optional heat exchanger or immersion heater. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Rinse-Water Pump and Heater parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Main Rinse-Water Pump and Heater parts diagram: 1 main pump motor, 2 water temperature control, 3 pressure sensor. 3 parts in 3 top-level items.
Main Rinse-Water Pump and Heater parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Pump Motor 1× Drive motor for main rinse pump (1–2 kW)
2 Water Temperature Control 1× Plate or immersion heater for temperature control
3 Pressure Sensor 1× Pump discharge pressure sensor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Rinse-Water Pump and Heater

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Pump Motor bottle-rinser-blower-main-pump-motor 1× 1 · part
2 Water Temperature Control bottle-rinser-blower-heat-exchanger 1× 1 · part
3 Pressure Sensor pressure-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the main rinse-water pump and heater is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks