Disc-Stack Bowl
AssemblyStacked conical discs spinning at high speed to create centrifugal force field. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Disc-Stack Bowl parts and their functions
6 top-level parts · 18 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bowl Housing | 1× | Cast iron or steel outer drum |
| 2 | Disc Stack | 1× | Stacked polymer or titanium discs |
| 3 | Scroll Auger | 1× | Rotating screw removing solids |
| 4 | Scroll Flight | 12× | Helical conveyor blades |
| 5 | Journal Bearing | 2× | Top and bottom bearings |
| 6 | Mechanical Shaft Seal | 1× | Mechanical seal at drive end |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Disc-Stack Bowl
6 top-level lines · 6 rows shown · 18 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bowl Housing | brewery-centrifuge-bowl-housing | 1× | 1 | · | part |
| 2 | Disc Stack | brewery-centrifuge-disc-stack | 1× | 1 | · | part |
| 3 | Scroll Auger | brewery-centrifuge-scroll-auger | 1× | 1 | · | part |
| 4 | Scroll Flight | brewery-centrifuge-scroll-flights | 12× | 12 | · | part |
| 5 | Journal Bearing | brewery-centrifuge-bearing-journal | 2× | 2 | · | part |
| 6 | Mechanical Shaft Seal | brewery-centrifuge-shaft-seal | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the disc-stack bowl is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |