BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Mash Tun

Assembly

Insulated stainless steel vessel with false bottom and raking arms for even grain bed compaction and temperature stability during mashing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mash Tun parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Mash Tun parts diagram: 1 mash tun body, 2 false bottom & frame, 3 raking arm, 4 mash outlet valve, 5 heating element. 7 parts in 5 top-level items.
Mash Tun parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mash Tun Body 1× 100L stainless steel vessel
2 False Bottom & Frame 1× Slotted screen and support frame
3 Raking Arm 2× Paddles for grain breaking and settling
4 Mash Outlet Valve 1× Ball valve and dip tube assembly
5 Heating Element 2× Immersion elements for strike water preheating

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mash Tun

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mash Tun Body brewhouse-system-mash-tun-body 1× 1 · part
2 False Bottom & Frame brewhouse-system-false-bottom 1× 1 · part
3 Raking Arm brewhouse-system-raking-arm 2× 2 · part
4 Mash Outlet Valve brewhouse-system-mash-outlet 1× 1 · part
5 Heating Element heating-element 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the mash tun is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks