BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Separation Column

Assembly

Stainless steel or carbon steel cylindrical vessel, 200–500 mm diameter, housing internal baffle and airflow chambers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Separation Column parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Main Separation Column parts diagram: 1 main cylinder, 2 baffle divider plate, 3 bean inlet port, 4 outlet port, 5 fastener set. 5 parts in 5 top-level items.
Main Separation Column parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Cylinder 1× Welded or seamed metal tube, 3–6 mm wall
2 Baffle Divider Plate 1× Internal divider creating lift and settling zones
3 Bean Inlet Port 1× Threaded or flanged bean inlet attachment
4 Outlet Port 1× Discharge outlet for cleaned beans
5 Fastener Set 1× Mounting feet and port flanges

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Separation Column

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Cylinder coffee-destoner-cylinder 1× 1 · part
2 Baffle Divider Plate coffee-destoner-baffle-plate 1× 1 · part
3 Bean Inlet Port coffee-destoner-inlet-port 1× 1 · part
4 Outlet Port coffee-destoner-outlet-port 1× 1 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the main separation column is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks