Blade Frame Assembly
AssemblyTwo counter-moving frames each carrying half the blades, so adjacent slices are cut by blades stroking in opposite directions and side loads cancel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Blade Frame Assembly parts and their functions
6 top-level parts · 72 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Slicing Blade | 32× | Slicing blades |
| 2 | Upper Blade Frame | 1× | Upper blade frame |
| 3 | Lower Blade Frame | 1× | Lower blade frame |
| 4 | Blade Tension Bolt | 32× | Blade tensioners |
| 5 | Frame Slide Guide | 4× | Frame slide guides |
| 6 | Slice-Pitch Comb | 2× | Slice-pitch combs |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Blade Frame Assembly
6 top-level lines · 6 rows shown · 72 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Slicing Blade | commercial-bread-slicer-blade | 32× | 32 | · | part |
| 2 | Upper Blade Frame | commercial-bread-slicer-upper-frame | 1× | 1 | · | part |
| 3 | Lower Blade Frame | commercial-bread-slicer-lower-frame | 1× | 1 | · | part |
| 4 | Blade Tension Bolt | commercial-bread-slicer-tension-bolt | 32× | 32 | · | part |
| 5 | Frame Slide Guide | commercial-bread-slicer-frame-guide | 4× | 4 | · | part |
| 6 | Slice-Pitch Comb | commercial-bread-slicer-spacer-comb | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the blade frame assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |