Air Blow System
AssemblyThe warm-air blowers that dry the dough skin slightly so the rounded ball holds its shape and releases at the top. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Air Blow System parts and their functions
4 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Air Blower | 1× | Air blower |
| 2 | Air Heater 2 parts | 1× | Air heater |
| 3 | Air Duct | 1× | Air duct |
| 4 | Air Nozzle | 4× | Air nozzles |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Air Blow System
4 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Air Blower | dough-rounder-blower | 1× | 1 | · | part |
| 2 | Air Heater 2 parts | dough-rounder-air-heater | 1× | 1 | 2 | assembly |
| 2.1 | Heating Element | heating-element | 1× | 1 | · | part |
| 2.2 | Air Thermostat | dough-rounder-air-thermostat | 1× | 1 | · | part |
| 3 | Air Duct | dough-rounder-air-duct | 1× | 1 | · | part |
| 4 | Air Nozzle | dough-rounder-air-nozzle | 4× | 4 | · | part |
Where the air blow system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |