Frame & Support
AssemblyThe structure that carries the chamber, plenum, and filter housing and lets the bowl be lowered for loading and cleaning. It includes the air ducting between the fan, heater, and chamber. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Frame & Support parts and their functions
4 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Support Frame | 1× | Main support frame |
| 2 | Bowl Lift 3 parts | 1× | Bowl lift mechanism |
| 3 | Process Ducting | 1× | Process air ducting |
| 4 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Frame & Support
4 top-level lines · 7 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Support Frame | fbd-support-frame | 1× | 1 | · | part |
| 2 | Bowl Lift 3 parts | fbd-bowl-lift | 1× | 1 | 6 | assembly |
| 2.1 | Pneumatic Cylinder | pneumatic-cylinder | 2× | 2 | · | part |
| 2.2 | Linear Guide Rail | linear-guide | 2× | 2 | · | part |
| 2.3 | Connector | connector | 2× | 2 | · | part |
| 3 | Process Ducting | fbd-ducting | 1× | 1 | · | part |
| 4 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the frame & support is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |