BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Flour Packing Station

Assembly

Final sieving, weighing, and bagging line that checks the flour and fills 25–50 kg bags or bulk tankers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Flour Packing Station parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Flour Packing Station parts diagram: 1 rebolt check sifter, 2 net weigh hopper, 3 bag filling spout, 4 bag stitcher, 5 packing metal detector. 5 parts in 5 top-level items.
Flour Packing Station parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Rebolt Check Sifter 1× Check sifter
2 Net Weigh Hopper 1× Net weigher
3 Bag Filling Spout 1× Bag filling spout
4 Bag Stitcher 1× Bag closer
5 Packing Metal Detector 1× Final metal check

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Flour Packing Station

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Rebolt Check Sifter flour-mill-rebolt-sifter 1× 1 · part
2 Net Weigh Hopper flour-mill-weigh-hopper 1× 1 · part
3 Bag Filling Spout flour-mill-bag-spout 1× 1 · part
4 Bag Stitcher flour-mill-bag-stitcher 1× 1 · part
5 Packing Metal Detector flour-mill-metal-detector 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the flour packing station is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks