BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Cabinet

Assembly

PLC, drives and operator HMI. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Cabinet parts and their functions

9 top-level parts · 1,406 parts in total · full bill of materials below
Control Cabinet parts diagram: 1 PLC, 2 variable frequency drive, 3 operator HMI, 4 power supply, 5 relay, 6 connector, 7 wire bundle, 8 sheet metal panel, 9 pressure sensor. 1,406 parts in 9 top-level items.
Control Cabinet parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 PLC 5 parts 1×
2 Variable Frequency Drive 5 parts 6×
3 Operator HMI 5 parts 1×
4 Power Supply 2× Unit that converts mains or battery input into the regulated DC voltages a machine's electronics and actuators need.
5 Relay 24× Electromechanical switch in which a small coil current closes or opens contacts rated for a much larger load, isolating control circuits from what they switch.
6 Connector 60× Mating plug-and-socket pair that joins two lengths of wiring or a cable to a board so a circuit can be assembled, serviced, and separated without soldering.
7 Wire Bundle 1× Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.
8 Sheet Metal Panel 4× Flat or folded sheet-metal panel, cut and bent to shape, that forms the enclosure, guards, or skin of a machine.
9 Pressure Sensor 2× Transduces fluid or gas pressure into an electrical signal.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Cabinet

9 top-level lines · 24 rows shown · 1,406 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 PLC 5 parts fruit-grading-line-plc 1× 1 295 assembly
1.1 Bare PCB pcb-bare 1× 1 · part
1.2 Microcontroller mcu 2× 2 · part
1.3 CAN Transceiver can-transceiver 2× 2 · part
1.4 Connector connector 40× 40 · part
1.5 SMD Passive (R/C/L) smd-passives 250× 250 · part
2 Variable Frequency Drive 5 parts fruit-grading-line-vfd 6× 6 154 assembly
2.1 Bare PCB pcb-bare 1× 6 · part
2.2 Power MOSFET mosfet 6× 36 · part
2.3 Gate Driver IC gate-driver-ic 6× 36 · part
2.4 Power Supply power-supply 1× 6 · part
2.5 SMD Passive (R/C/L) smd-passives 140× 840 · part
3 Operator HMI 5 parts fruit-grading-line-hmi 1× 1 94 assembly
3.1 LCD Panel lcd-panel 1× 1 · part
3.2 Touch Digitizer touch-digitizer 1× 1 · part
3.3 Bare PCB pcb-bare 1× 1 · part
3.4 Microcontroller mcu 1× 1 · part
3.5 SMD Passive (R/C/L) smd-passives 90× 90 · part
4 Power Supply power-supply 2× 2 · part
5 Relay relay 24× 24 · part
6 Connector connector 60× 60 · part
7 Wire Bundle wire-bundle 1× 1 · part
8 Sheet Metal Panel sheet-panel 4× 4 · part
9 Pressure Sensor pressure-sensor 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the control cabinet is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks