BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Outlet Lanes

Assembly

Padded chutes and bins collect each grade. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Outlet Lanes parts and their functions

4 top-level parts · 62 parts in total · full bill of materials below
Outlet Lanes parts diagram: 1 lane chute, 2 collection bin, 3 padding belt, 4 frame section. 62 parts in 4 top-level items.
Outlet Lanes parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lane Chute 16× Spiral let-down chute that lowers fruit gently.
2 Collection Bin 16×
3 Padding Belt 16×
4 Frame Section 3 parts 2×

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Outlet Lanes

4 top-level lines · 7 rows shown · 62 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lane Chute fruit-grading-line-lane-chute 16× 16 · part
2 Collection Bin fruit-grading-line-collection-bin 16× 16 · part
3 Padding Belt fruit-grading-line-padding-belt 16× 16 · part
4 Frame Section 3 parts fruit-grading-line-frame-section 2× 2 7 assembly
4.1 Sheet Metal Panel sheet-panel 2× 4 · part
4.2 Leveling Foot fruit-grading-line-leveling-foot 4× 8 · part
4.3 Fastener Set fastener-set 1× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the outlet lanes is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks