BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Frame Body

Assembly

Welded steel structure that carries every subsystem and the access panels. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame Body parts and their functions

6 top-level parts · 17 parts in total · full bill of materials below
Frame Body parts diagram: 1 frame weldment, 2 access panel, 3 support leg, 4 sheet metal panel, 5 maintenance walkway, 6 fastener set. 17 parts in 6 assemblies.
Frame Body parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Frame Weldment Main frame weldment
2 Access Panel Access and inspection panels
3 Support Leg Adjustable support legs
4 Sheet Metal Panel Enclosure sheet panels
5 Maintenance Walkway Maintenance walkway
6 Fastener Set Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame Body

6 top-level lines · 6 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Frame Weldment grain-cleaning-machine-frame-weldment 1 · part
2 Access Panel grain-cleaning-machine-access-panel 4 · part
3 Support Leg grain-cleaning-machine-leg 4 · part
4 Sheet Metal Panel sheet-panel 6 · part
5 Maintenance Walkway grain-cleaning-machine-walkway 1 · part
6 Fastener Set fastener-set 1 · part

Where the frame body is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks