Frame Body
AssemblyWelded steel structure that carries every subsystem and the access panels. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Frame Body parts and their functions
6 top-level parts · 17 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Frame Weldment | 1× | Main frame weldment |
| 2 | Access Panel | 4× | Access and inspection panels |
| 3 | Support Leg | 4× | Adjustable support legs |
| 4 | Sheet Metal Panel | 6× | Enclosure sheet panels |
| 5 | Maintenance Walkway | 1× | Maintenance walkway |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Frame Body
6 top-level lines · 6 rows shown · 17 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Frame Weldment | grain-cleaning-machine-frame-weldment | 1× | 1 | · | part |
| 2 | Access Panel | grain-cleaning-machine-access-panel | 4× | 4 | · | part |
| 3 | Support Leg | grain-cleaning-machine-leg | 4× | 4 | · | part |
| 4 | Sheet Metal Panel | sheet-panel | 6× | 6 | · | part |
| 5 | Maintenance Walkway | grain-cleaning-machine-walkway | 1× | 1 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the frame body is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |