BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cooling Tunnel

Assembly

Insulated chamber with ambient air or chilled water circulation that sets deposited gummies to 8–15°C in 4–6 minutes before demolding. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cooling Tunnel parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Cooling Tunnel parts diagram: 1 tunnel shell, 2 blower motor, 3 cooling heat exchanger, 4 cooling conveyor, 5 drive belt. 6 parts in 5 top-level items.
Cooling Tunnel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Tunnel Shell 1× Stainless steel frame with polyurethane foam insulation (50 mm)
2 Blower Motor 2× Two 0.5 kW EC motors for parallel airflow (1 m³/min each)
3 Cooling Heat Exchanger 1× Aluminum finned heat exchanger or chilled water loop
4 Cooling Conveyor 1× Stainless steel HABASIT belt 600 mm wide, 2 m long
5 Drive Belt 1× HTD 5M pulley drive for conveyor motor (0.25 kW)

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cooling Tunnel

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tunnel Shell gummy-depositor-tunnel-frame 1× 1 · part
2 Blower Motor blower-motor 2× 2 · part
3 Cooling Heat Exchanger gummy-depositor-cooling-coil 1× 1 · part
4 Cooling Conveyor gummy-depositor-conveyor-belt 1× 1 · part
5 Drive Belt drive-belt 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cooling tunnel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks