Dasher Drive
AssemblyVariable-speed motor and reduction gearbox turning the dasher against the viscous frozen load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Dasher Drive parts and their functions
7 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Dasher Drive Motor | 1× | Variable-frequency drive motor |
| 2 | Gearbox Housing | 1× | Reduction gearbox case |
| 3 | Helical Gear Pair | 2× | Reduction gear stages |
| 4 | Drive Coupling | 1× | Shaft coupling to the dasher |
| 5 | Drive Torque Sensor | 1× | Drive torque sensor for viscosity |
| 6 | Drive Belt | 1× | Motor to gearbox belt |
| 7 | Oil Seal | 2× | Gearbox output seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Dasher Drive
7 top-level lines · 7 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Dasher Drive Motor | ice-cream-freezer-continuous-drive-motor | 1× | 1 | · | part |
| 2 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 3 | Helical Gear Pair | gear-pair | 2× | 2 | · | part |
| 4 | Drive Coupling | ice-cream-freezer-continuous-coupling | 1× | 1 | · | part |
| 5 | Drive Torque Sensor | ice-cream-freezer-continuous-torque-sensor | 1× | 1 | · | part |
| 6 | Drive Belt | drive-belt | 1× | 1 | · | part |
| 7 | Oil Seal | oil-seal | 2× | 2 | · | part |
Where the dasher drive is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |