Slicing Head
AssemblyBank of parallel blades held at fixed pitch in a frame that cuts the loaf into uniform slices in one pass. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Slicing Head parts and their functions
6 top-level parts · 128 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Slicing Blade | 30× | Parallel slicing blades |
| 2 | Blade Frame | 1× | Blade tensioning frame |
| 3 | Blade Clamp | 60× | Blade end clamps |
| 4 | Blade Spacer | 31× | Blade pitch spacers |
| 5 | Tension Bolt | 4× | Frame tension bolts |
| 6 | Blade Scraper | 2× | Blade dough scrapers |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Slicing Head
6 top-level lines · 6 rows shown · 128 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Slicing Blade | industrial-bread-slicer-line-blade | 30× | 30 | · | part |
| 2 | Blade Frame | industrial-bread-slicer-line-blade-frame | 1× | 1 | · | part |
| 3 | Blade Clamp | industrial-bread-slicer-line-blade-clamp | 60× | 60 | · | part |
| 4 | Blade Spacer | industrial-bread-slicer-line-spacer | 31× | 31 | · | part |
| 5 | Tension Bolt | industrial-bread-slicer-line-tension-bolt | 4× | 4 | · | part |
| 6 | Blade Scraper | industrial-bread-slicer-line-scraper | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the slicing head is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |