BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Process Chamber

Assembly

Insulated stainless cell, one to four trolleys deep, that contains the product during smoking, cooking, and drying cycles up to 100 °C. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Process Chamber parts and their functions

6 top-level parts · 13 parts in total · full bill of materials below
Process Chamber parts diagram: 1 insulated wall panel, 2 chamber door, 3 drained floor, 4 air distribution wall, 5 trolley guide rail, 6 fastener set. 13 parts in 6 top-level items.
Process Chamber parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Insulated Wall Panel 6× Insulated panels
2 Chamber Door 1× Sealed door
3 Drained Floor 1× Drained floor
4 Air Distribution Wall 2× Air distribution walls
5 Trolley Guide Rail 2× Guide rails
6 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Process Chamber

6 top-level lines · 6 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Insulated Wall Panel industrial-smokehouse-wall-panel 6× 6 · part
2 Chamber Door industrial-smokehouse-door-assy 1× 1 · part
3 Drained Floor industrial-smokehouse-floor 1× 1 · part
4 Air Distribution Wall industrial-smokehouse-duct-wall 2× 2 · part
5 Trolley Guide Rail industrial-smokehouse-trolley-rail 2× 2 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the process chamber is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks