BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Drain and Recovery

Assembly

Sloped sump that catches spent detergent and rinse water, returns reusable warm pre-rinse to the wash, and routes contaminated effluent to drain. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drain and Recovery parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Drain and Recovery parts diagram: 1 recovery sump, 2 recovery pump, 3 Recover/Drain diverter, 4 warm-water recovery tank, 5 drain debris screen. 6 parts in 5 top-level items.
Drain and Recovery parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Recovery Sump 1× Sloped 304 collection sump
2 Recovery Pump 1× Effluent and recovery pump
3 Recover/Drain Diverter 2× Recover/drain diverter valve
4 Warm-Water Recovery Tank 1× Warm-water recovery tank
5 Drain Debris Screen 1× Coarse debris screen

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drain and Recovery

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Recovery Sump keg-filling-machine-recovery-sump 1× 1 · part
2 Recovery Pump keg-filling-machine-recovery-pump 1× 1 · part
3 Recover/Drain Diverter keg-filling-machine-diverter-valve 2× 2 · part
4 Warm-Water Recovery Tank keg-filling-machine-recovery-tank 1× 1 · part
5 Drain Debris Screen keg-filling-machine-drain-filter 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the drain and recovery is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks