BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Frame and Keg Cradle

Assembly

Stainless 304 welded frame carrying the keg cradle, the inversion station that turns the keg neck-down over the head, and the lift that presses the keg onto the coupling. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame and Keg Cradle parts and their functions

8 top-level parts · 12 parts in total · full bill of materials below
Frame and Keg Cradle parts diagram: 1 base frame weldment, 2 keg cradle saddle, 3 inversion station arm, 4 clamp lift cylinder, 5 keg presence sensor, 6 interlocked guard panel, 7 linear guide rail, 8 fastener set. 12 parts in 8 top-level items.
Frame and Keg Cradle parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Frame Weldment 1× AISI 304 tube and plate weldment
2 Keg Cradle Saddle 1× Profiled saddle for 20-50 L kegs
3 Inversion Station Arm 1× Neck-down rotation station
4 Clamp Lift Cylinder 1× Pneumatic clamp/lift cylinder
5 Keg Presence Sensor 1× Keg-in-station detection
6 Interlocked Guard Panel 4× Polycarbonate interlock guard
7 Linear Guide Rail 2× Cradle lift guide rails
8 Fastener Set 1× Frame and panel hardware

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame and Keg Cradle

8 top-level lines · 8 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Frame Weldment keg-filling-machine-base-frame 1× 1 · part
2 Keg Cradle Saddle keg-filling-machine-keg-cradle 1× 1 · part
3 Inversion Station Arm keg-filling-machine-inversion-arm 1× 1 · part
4 Clamp Lift Cylinder keg-filling-machine-lift-cylinder 1× 1 · part
5 Keg Presence Sensor keg-filling-machine-presence-sensor 1× 1 · part
6 Interlocked Guard Panel keg-filling-machine-guard-panel 4× 4 · part
7 Linear Guide Rail linear-guide 2× 2 · part
8 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the frame and keg cradle is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks