BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

CIP (Cleaning-in-Place)

Assembly

Automated hot-water and caustic wash cycle without disassembly. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

CIP (Cleaning-in-Place) parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
CIP (Cleaning-in-Place) parts diagram: 1 CIP pump, 2 CIP tank, 3 CIP heater, 4 solenoid valve, 5 spray ball. 6 parts in 5 top-level items.
CIP (Cleaning-in-Place) parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 CIP Pump 1× Low-pressure washdown pump
2 CIP Tank 1× Solution reservoir, 100–200 L
3 CIP Heater 1× Immersion heater for hot water
4 Solenoid Valve 2× Solenoid valves for wash routing
5 Spray Ball 1× Impact nozzle for internal cleaning

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for CIP (Cleaning-in-Place)

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 CIP Pump mash-filter-cip-pump 1× 1 · part
2 CIP Tank mash-filter-cip-tank 1× 1 · part
3 CIP Heater mash-filter-cip-heater 1× 1 · part
4 Solenoid Valve mash-filter-cip-valve-solenoid 2× 2 · part
5 Spray Ball mash-filter-cip-spray-ball 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the CIP (cleaning-in-place) is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks