BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Work Table and Guides

Assembly

Stainless steel or cast iron sliding or tilting cutting table with adjustable fence, mitre gauge, and blade guidance. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Work Table and Guides parts and their functions

4 top-level parts · 5 parts in total · full bill of materials below
Work Table and Guides parts diagram: 1 cutting table surface, 2 table slide guides, 3 table advance mechanism, 4 adjustable fence and gauge. 5 parts in 4 top-level items.
Work Table and Guides parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cutting Table Surface 1× Precision-ground stainless or ductile iron table 300 x 500 mm
2 Table Slide Guides 2× Ball-bearing linear guide rails on machine frame
3 Table Advance Mechanism 1× Hand wheel or power drive for table advance
4 Adjustable Fence and Gauge 1× Adjustable stop bar or angle gauge

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Work Table and Guides

4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cutting Table Surface meat-bandsaw-table-top 1× 1 · part
2 Table Slide Guides meat-bandsaw-table-guides 2× 2 · part
3 Table Advance Mechanism meat-bandsaw-table-movement 1× 1 · part
4 Adjustable Fence and Gauge meat-bandsaw-fence 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the work table and guides is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks