BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cup Sensor Switches

Assembly

Position sensors detecting when a cup is placed under a spindle. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cup Sensor Switches parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Cup Sensor Switches parts diagram: 1 cup lever switch, 2 switch contact, 3 switch guard, 4 dwell timer. 4 parts in 4 top-level items.
Cup Sensor Switches parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cup Lever Switch 1× Mechanical lever-actuated switch (qty 2–8)
2 Switch Contact 1× Normally-open electrical contact
3 Switch Guard 1× Protective shroud over lever
4 Dwell Timer 1× Adjustable contact dwell time

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cup Sensor Switches

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cup Lever Switch milkshake-spindle-mixer-switch-lever 1× 1 · part
2 Switch Contact milkshake-spindle-mixer-switch-contact 1× 1 · part
3 Switch Guard milkshake-spindle-mixer-switch-guard 1× 1 · part
4 Dwell Timer milkshake-spindle-mixer-switch-timing 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cup sensor switches is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$80. How estimates work
VendorHQSpecialtyMOQLead time
sunnyoptical.com ↗ Ningbo, CN Optics & camera modules 1,000 pcs 8–12 wks
🇨🇳OFILM
ofilm.com ↗
Shenzhen, CN Camera modules 1,000 pcs 8–12 wks
vvdntech.com ↗ Gurugram, IN Electronics & camera modules 1,000 pcs 8–12 wks
🇨🇳Truly Opto
truly.net ↗
Shanwei, CN Displays & camera modules 1,000 pcs 8–12 wks
aactechnologies.com ↗ Singapore Acoustics & optics 1,000 pcs 8–12 wks