BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Material Flow Channels

Assembly

Internal baffles and paths directing sized material from each sieve level to discharge chutes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Material Flow Channels parts and their functions

4 top-level parts · 11 parts in total · full bill of materials below
Material Flow Channels parts diagram: 1 internal baffle plate, 2 discharge material chute, 3 chute connection gasket, 4 fastener set. 11 parts in 4 top-level items.
Material Flow Channels parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Internal Baffle Plate 4× Dividing plates between sieve compartments
2 Discharge Material Chute 3× Material collection chutes at each level
3 Chute Connection Gasket 3× Gaskets preventing bypass
4 Fastener Set 1× Assembly bolts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Material Flow Channels

4 top-level lines · 4 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Internal Baffle Plate plansifter-baffle-plate 4× 4 · part
2 Discharge Material Chute plansifter-discharge-chute 3× 3 · part
3 Chute Connection Gasket plansifter-chute-seal 3× 3 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the material flow channels is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks