BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Slicer

Assembly

Rotating blade assembly slicing potatoes into uniform 1–2 mm thick chips at 100–150 kg/h feed rate. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Slicer parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Slicer parts diagram: 1 slicer hopper, 2 slicer drum, 3 slicer motor, 4 slicer housing, 5 blade set. 5 parts in 5 top-level items.
Slicer parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Slicer Hopper 1× Stainless hopper with gravity chute to blade
2 Slicer Drum 1× Rotating slicing head with carbide blades
3 Slicer Motor 1× AC motor 2 kW, directly driving drum
4 Slicer Housing 1× Guarding and discharge chute
5 Blade Set 1× Carbide or stainless inserts, replaceable

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Slicer

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Slicer Hopper potato-chip-fryer-line-slicer-hopper 1× 1 · part
2 Slicer Drum potato-chip-fryer-line-slicer-drum 1× 1 · part
3 Slicer Motor potato-chip-fryer-line-slicer-motor 1× 1 · part
4 Slicer Housing potato-chip-fryer-line-slicer-housing 1× 1 · part
5 Blade Set potato-chip-fryer-line-blade-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the slicer is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks