BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Panel and Monitoring

Assembly

Programmable controller with sensors for drum speed, moisture, and egg damage tracking. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Panel and Monitoring parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Control Panel and Monitoring parts diagram: 1 PLC controller, 2 HMI touchscreen, 3 encoder, 4 pressure sensor, 5 relay. 6 parts in 5 top-level items.
Control Panel and Monitoring parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 PLC Controller 1× Compact PLC for speed and load control
2 HMI Touchscreen 1× Operator interface touchscreen
3 Encoder 1× Drum speed encoder for feedback control
4 Pressure Sensor 1× Drum pressure load monitoring
5 Relay 2× Motor and solenoid control relays

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Panel and Monitoring

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 PLC Controller roe-extraction-machine-plc 1× 1 · part
2 HMI Touchscreen roe-extraction-machine-hmi 1× 1 · part
3 Encoder encoder 1× 1 · part
4 Pressure Sensor pressure-sensor 1× 1 · part
5 Relay relay 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the control panel and monitoring is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳BOE
boe.com ↗
Beijing, CN Display panels 1,000 pcs 6–10 wks
🇨🇳Tianma
tianma.com ↗
Shenzhen, CN Display panels 1,000 pcs 6–10 wks
🇨🇳TCL CSOT
szcsot.com ↗
Shenzhen, CN Display panels 1,000 pcs 6–10 wks
🇨🇳Truly Opto
truly.net ↗
Shanwei, CN Displays & camera modules 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks