Drying Chamber
AssemblyThe tall vertical vessel where atomized droplets meet hot air and dry. A cylindrical upper section and a steep conical bottom guide the powder downward, with insulated double walls to hold heat and an inspection door for cleaning. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Drying Chamber parts and their functions
8 top-level parts · 37 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Chamber Cylinder | 1× | Cylindrical upper shell |
| 2 | Chamber Cone | 1× | Conical lower section |
| 3 | Insulation Jacket | 1× | Mineral-wool insulation jacket |
| 4 | Outer Cladding | 1× | Stainless cladding |
| 5 | Sight Glass | 2× | Inspection ports |
| 6 | CIP Spray Ball | 6× | Clean-in-place spray balls |
| 7 | Wall Hammer System 3 parts | 1× | Wall-rapping anti-deposit hammers |
| 8 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Drying Chamber
8 top-level lines · 11 rows shown · 37 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Chamber Cylinder | sdt-chamber-cylinder | 1× | 1 | · | part |
| 2 | Chamber Cone | sdt-chamber-cone | 1× | 1 | · | part |
| 3 | Insulation Jacket | sdt-chamber-insulation | 1× | 1 | · | part |
| 4 | Outer Cladding | sdt-chamber-cladding | 1× | 1 | · | part |
| 5 | Sight Glass | sdt-sight-glass | 2× | 2 | · | part |
| 6 | CIP Spray Ball | sdt-cip-nozzle | 6× | 6 | · | part |
| 7 | Wall Hammer System 3 parts | sdt-hammer-system | 1× | 1 | 24 | assembly |
| 7.1 | Wall Hammer | sdt-hammer-actuator | 8× | 8 | · | part |
| 7.2 | Pneumatic Cylinder | pneumatic-cylinder | 8× | 8 | · | part |
| 7.3 | Connector | connector | 8× | 8 | · | part |
| 8 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the drying chamber is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |